

Infrastructure · 12–20 t excavators
A pipeline contractor needed layer-by-layer compaction in deep trenches and on sloped spoil. Excavator-mounted plate compactors replaced walk-behind rammers inside the trench.

Workers inside deep trenches face collapse risk, and rammers were slow on long sections and on embankment slopes.
| Carrier | 12–20 t excavator |
|---|---|
| Force | 6.5–10 t |
| Plate | 900 × 700 mm |
| Frequency | 2,000 vpm |







Oversize granite blocks after blasting were slowing the primary crusher. A 40G-class open breaker on a 36 t excavator reduces boulders at the muck pil…
Read project
A reinforced-concrete frame in a dense neighbourhood had to come down with low noise and minimal dust. A 360° rotating pulverizer crushed walls and se…
Read project
A timber yard replaced a bucket-and-thumb setup with a rotating log grapple, making stacking, sorting and truck loading faster and safer.…
Read projectStart your order
Send the carrier model, auxiliary oil flow and what you need to break, grab, cut or drill. You’ll get a matched model, drawing and price within one working day.